Tower Crane must be operated by personals that qualified with following skills 1. Operation and Control – Controlling operations of equipment or systems. Operation Monitoring – Watching gauges, dials,
Terex Cranes has introduced the Terex CTT 472-20, a flat top tower crane that expands the maximum jib length for the OEM’s 20-tonne class to 80m, and allows a maximum load at the full length of the
1. Attention to Detail – Job requires being careful about detail and thorough in completing work tasks. 2. Dependability – Job requires being reliable, responsible, and dependable, and fulfilling obl
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen